9 am - 6 pm, Mon to Sat | hbfittings@hbgroup.in

+91-98158-90585

Computer Aided Designing 1

 Computer Aided Designing

Raw Material 2

 Raw Material

Chemical Analysis 3

Chemical Analysis

Shell Core Preparation 4

Shell Core Preparation

Electric Induction Furnace 5

Electric Induction Furnance

Oil Fired Annealing Furance 6

Oil Fired Annealing Furnace

Electric Annealing Furnace 7

Electric Annealing Furnace

Comresssion Test 8

Comresssion Test

Grinding Process 9

Grinding Process

Shot Blast 10

Shot Blast

Hot Dip Galvansing 11

Hot Dip Galvansing

Charmfering 12

Charmfering

Machining & Threading 13

Machining & Threading

Angle Alignment Inspection 14

Angle Alignment Inspection

Drying & Cleaning Process 15

Drying & Cleaning Process

Hydraulic Pressure Testing 16

Hydraulic Pressure Testing

Pre Delivery Inspection 17

Pre Delivery Inspection

Gunny Bag Packing 18

Gunny Bag Packing

Final Dispatch of Goods 19

Final Dispatch of Goods